Skip links

Author: pntyzlm

BAYBURT DEMİRÖZÜ POTABLE WATER TREATMENT PLANT

The construction of a potable water treatment plant with a capacity of 600 m³/day in Demirözü Municipality of Bayburt province has been completed and the plant has been engaged. Önceki Sonraki

BİLECİK ŞEYH EDEBALİ UNIVERSITY WASTE WATER TREATMENT PLANT

Package treatment plants have been established for domestic wastewater treatment at Şeyh Edebali University in Bilecik. With a total capacity of 900 m3/day, the domestic wastewater of the university complex is treated and discharged in accordance with the discharge standards of the Water Pollution Control

TATLIBAK 10 m³/day INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION WORK

Process wastewater of Tatlıbak Gıda production facilities in Dudullu OSB, Industrial Wastewater Treatment Plant with a capacity of 10 m3/day was completed and delivered in 2020. Food process wastewater is subjected to physical, chemical and biological treatment processes and İSKİ Sewerage discharge standards provided. Önceki

CURENT METAL – 10 m³/ Day CAPACITY POTABLE WATER TREATMENT SYSTEM

In the Curent Metal production plant in Romania, in order to provide the need for demineralized water to be used in injection presses, well water is treated with a reverse osmosis membrane system after passing through the water softener system, and used as process water

CURENT METAL-50 m3/day CAPACİTY INDUSTRİAL WASTEWATER TREATMENT PLANT

Metal Injection Presses and metal processing plants wastewater; contains high oil-grease and COD concentration. At Curent Metal Industrial Wastewater Treatment Plant in Romania, process wastewater is treated with DAF (Dissolved air flotation), chemical treatment and multimedia filter. The plant was engaged in February 2022. Önceki

Explore
Drag